As the project nears the final stages, work commitments have slowed down the process, i have a few interior parts to finish along with touching up areas in general.
Still running in the engine, its a slow process as i want to kee an eys on oil levels, temps and the general condition of the engine, i have been increasing the distance travelled and hope to have the engine run in before the end of September (weather permitting).
Up to 320 miles with minor leaks from the dizzy and tranny pressure fitting on the trans, the dizzy leak could be down to the increased crank case compression with the engine now being a 383 stroker, more investigations to be done.