With the trip to the spray shop looming i needed to get the body and the chassis re-united, now the fuel pump, filter, engine and tranny were in place most of the difficult 'under car' work was complete, the drive shaft was left off and the diff was filled with oil and addititve as the car would be towed to the spray shop.

The chassis ready to go.

The body sat on the dolly with the engine hoist attached.

The chassis ready to pull out and the body ready to be lifted.

The chassis sees daylight for the first time since the engine install.

Another................

The body was lifted up to 900mm clearance from the bottom of the spoiler to ground level.